Attenuation Volume to Crate Count Estimator

Once the drainage strategy has fixed the attenuation volume, the next question is how much ground the crate field will actually take. This converts a storage duty into module count, plan area and excavation depth — the three numbers a groundworks package is priced on.

1. Attenuation storage volume required (m³)
2. Module depth
3. How many layers can the build-up stack?
Enter a storage volume between 1 and 20,000 m³.
Module
Storage delivered
Plan area of the crate field
Crate stack depth
Land equivalent, if held as an open basin instead
Get a storage-volume estimate and kit take-off

Module count is derived from the nominal unit volumes above at a 95% void ratio, on a 1.0 m × 0.5 m module footprint. It is an indicative take-off for early feasibility, not a drainage design: silt-loss allowance to CIRIA C737, geotextile and geomembrane wrap, flow-control chamber, inspection access and excavation batter are excluded. Containerised loading quantities depend on module depth and packing and are quoted per order.